During a field visit, he confirmed that all technical and logistical preparations have been completed for the operation, which is expected to be carried out with high precision and according to the highest engineering standards. The second segment, which is 126 meters long and weighs 45,000 tons, will be carefully positioned and connected to the first one, achieving integration under the channel.
The immersed tunnel plays a pivotal role in connecting Al-Faw Grand Port with Um Qasr Port, enhancing Iraq’s maritime and land transport networks, and supporting the country’s strategic goal of becoming a regional and international transportation hub.